Skip to main content
Main content

Commercial plumbing service

Commercial Remodel Plumbing

Restaurant and retail refits, restroom and ADA fixture work, and phased plumbing in buildings that are still operating.

Call (850) 880-6797

A commercial refit has two problems a new building does not. The space is already built, so what you can do is limited by pipe somebody else installed years ago, and the building is usually still open, so the work has to fit around tenants, customers, and staff.

Beach to Bayou takes restaurant and retail conversions, restroom rebuilds, ADA fixture work, and the phased plumbing that goes with keeping part of a building in service while another part is torn apart.

Restaurant and retail refits

Turning a retail space into food service is the biggest jump in this category. A shell that was fine for a clothing store has a small waste line and a small water heater, and a kitchen needs grease waste, floor sinks to take indirect waste from ice machines and prep sinks, hand sinks where the drawings put them, a mop basin, and far more hot water than the space was built for.

A restaurant becoming a different restaurant is easier, but rarely clean. The last tenant's interceptor may be undersized for the new menu, the new equipment layout moves the floor sinks, and the under-slab piping is often full of grease. Running a camera through the existing waste line before the layout is final is worth doing first, because what it shows often changes the layout.

ADA fixture work in an existing restroom

Restroom work is where accessibility requirements bite, because the fixtures have to land in specific places instead of wherever the old ones sat. The water closet has a required distance from the side wall and a clear floor space around it. Partitions, and with limited exceptions door swings, have to stay out of that space. The lavatory needs knee clearance underneath, with the trap and hot water piping protected. Grab bars need solid backing in the wall, and the flush control goes on the open side of the fixture.

In practice that means the toilet drain usually has to move, which on a slab means cutting concrete. Converting two cramped single-user restrooms into one accessible restroom, or rebuilding a two-stall restroom so one stall meets the requirements, are both common scopes. The dimensions come from the approved drawings for the project, and the inspector checks them at trim-out with a tape measure.

What the existing building will support

As-built drawings for a twenty-year-old building rarely match what is actually in the ground, so existing conditions get verified rather than trusted. A camera down the sanitary line shows the material, standing water that points to a slope problem, and the cracks, scale, and separated joints that mean a cast iron line under the slab is failing. Adding fixtures also means checking the water side, because meter size, static pressure, pressure under flow, and the size of the riser feeding the space all cap how many fixtures the space can carry before the service has to be upsized.

Water heating is the other ceiling. A unit sized for two lavatories will not serve a new kitchen or a bank of showers, and whether there is electrical or gas capacity for a larger unit is a question for the general contractor before the plumbing scope is priced. It is far cheaper to find these limits while the drawings are still being marked up than in the middle of demolition.

Testing and inspections

Altered drain and vent piping and new water piping are tested and inspected before they are closed in, which in a commercial ceiling means before the grid and tile go back up. The building department for the address sets the test method and how long it has to hold.

The phases are the same as new construction, just compressed: underground while the slab is open, rough-in or top-out before walls and ceilings close, and trim-out once the fixtures are set. Any backflow assembly is tested and the result documented for the utility, and the grease interceptor is checked against the approved drawings. On a restaurant, the state plan review (Florida DBPR, Division of Hotels and Restaurants) runs on its own track alongside the building inspection.

Keeping the doors open

Work that disrupts the business, like cutting a slab, shutting the water down, or closing a restroom, is scheduled for the hours that hurt the business least, and neighboring tenants are told before it happens.

What that asks of the customer is access and a decision maker. That means keys or badges, a contact for the alarm, a route for material that avoids the dining room, and someone who can approve a change on the spot. Where a restroom or a kitchen has to stay usable throughout, the work gets split into phases so one side is always in service. That takes longer overall and costs more, and it keeps the business open.

What to expect

Food service conversion

Grease waste, floor sinks, hand sinks, and hot water capacity for a kitchen.

ADA restroom work

Fixtures relocated to the clearances on the approved drawings.

Existing conditions check

Camera, pressure, and capacity verified before the layout is fixed.

Phased work

Shutdowns and demolition scheduled around the hours you are open.

Common questions

Can you work at night or on our closed day?

Tell us the hours the space is empty. Water shutdowns, slab cutting, and restroom closures are scheduled into those hours where the crew schedule allows, and other tenants in the building are told first.

We are turning a retail space into a restaurant. What should we check first?

The existing sanitary line and the water service. Line size, slope, and condition decide where the kitchen can go, and meter size and pressure decide how many fixtures the space can carry. A camera down the waste line before the layout is final is worth doing first.

Does the restroom have to be made accessible during a remodel?

It depends on the scope of work and on what the approved drawings and the building department require for that project. In practice most restroom remodels end up moving fixtures to meet the clearances, so plan for it from the start.

Who tests the grease interceptor and the backflow preventer?

Beach to Bayou tests the backflow assembly and documents the result for the utility. The interceptor is verified against the approved drawings, while ongoing pumping and record keeping stay with the operator. Mention any notice you have already received.

Can part of the building stay open during the work?

Usually yes, by splitting the plumbing into phases so one restroom or one side of the kitchen stays in service. It takes longer overall and it costs more than doing everything at once, so decide early which of the two matters more.

Which areas do you cover for commercial remodels?

Beach to Bayou works in Freeport, Santa Rosa Beach, 30A, Panama City Beach, Miramar Beach, Destin, and nearby communities in Walton, Okaloosa, and Bay counties. When you call or send a request, give the city, the access contact, and the hours the building has to stay open.